The growing disaster in most of the Nigerian roads is partly the cause of economic set back in our nation. Farmers are left with no other option than the use of roads for sales of their produce.
In the advancement of our urgent need for remedy, Flyrate Excellence Limited has embedded the major and ideal processes in road construction which comprises of separation, reinforcement, filtration and drainage; which increase the pavement performance, reduce construction costs and decrease maintenance. The completed road way is finished by paving or left with a gravel or other natural surface.
We have a major stake in the field of road construction hence our ideas are transported through excellence in service delivery.